Resensys SenSpots Monitor East Capitol Bridge Across Anacostoia River (Washington D.C.)

Piers of highway bridges over rivers are vulnerable to hydraulic damage caused by flood, hurricane, and instability of the riverbed causing movement and settling of the piers.  Resensys High Precision tilt SenSpots sensors provide an ideal solution for structural health monitoring of such piers. In june 2014, Resensys SenSpot sensors were used on several piers of East Capitol Bridge Across Anacostia River to monitor their movement, settling and and deflections. Due to the bridge crossing the Anacostia River, a bucket boat was used for installation. SenSpots are bolted to the pictures for higher accuracy. Some pictures are courtesy of Siva Corrosion Services, Inc, who was Resensys’s  partner in this project.

IMG_0746

IMG_0728

IMG_0727

IMG_0707

IMG_0702

IMG_0683

IMG_1568

IMG_1572

IMG_1550

1

P1040605

IMG_1603

IMG_1593

IMG_1586

 

Leave a Reply

Your email address will not be published. Required fields are marked *

*